1. STANDARD OPERATING PROCEDURE FOR EP-DIV-SOP-20005, REVISION 0, IPC-1, GROUNDWATER MONITORING WELL DUAL-SCREEN SAMPLING SYSTEM INSTALLATION AND TESTING Document(s) Author: Everett, Mark C ; Douglass, Craig R Number: ERID-208359 ; 2011
2. Completion report for regional well R-60 Document(s) Author: Everett, Mark C Number: LA-UR-11-00189 ; 2011
4. Completion report for CdV-1674ip Document(s) Author: Everett, Mark C Number: LA-UR-11-00187 ; 2011
5. Completion report for replacement of water canyon alluvial wells WCO-1r and WCR-3r Document(s) Author: Everett, Mark C Number: LA-UR-11-00190 ; 2011
6. Drilling work plan for regional aquifer well R-66 Document(s) Author: Everett, Mark C Number: LA-UR-11-00184 ; 2011
7. Drilling work plans for R-64 and R-65 Document(s) Author: Everett, Mark C Number: LA-UR-11-00186 ; 2011
9. Work plan to plug and abandon test well 3 Document(s) Author: Everett, Mark C Number: LA-UR-11-00185 ; 2011