11. DOCUMENT: ANALYTICAL RESULTS FROM THE FIRST MEASURABLE STORM EVENT FOLLOWING INSTALLATION OF CONTROL MEASURES AT LA-SMA-5.35 Document(s) Author: Rhodes, David S McInroy, Dave Veenis, Steve Number: ERID-260909 ; 2014
12. LETTER: NPDES PERMIT NO. NM0030759 SUBMITTAL OF ANALYTICAL RESULTS FOR SIX SITE MONITORING AREAS Document(s) Author: Rhodes, David S McInroy, Dave Veenis, Steve Number: ERID-260906 ; 2014
13. DOCUMENT: ANALYTICAL RESULTS FROM THE FIRST MEASURABLE STORM EVENT FOLLOWING INSTALLATION OF CONTROL MEASURES AT 2M-SMA-1.7 Document(s) Author: Rhodes, David S McInroy, Dave Veenis, Steve Number: ERID-260907 ; 2014
14. LETTER: NPDES PERMIT NO. NM0030759 - SUBMITTAL OF CERTIFICATION OF INSTALLATION OF ENHANCED CONTROL MEASURES FOR FOUR SITE MONITORING AREAS Document(s) Author: Rhodes, David S McInroy, Dave Veenis, Steve Number: ERID-256722 ; 2014
15. LETTER: NPDES PERMIT NO. NM0030759 - SUBMITTAL OF COMPLETION OF CORRECTIVE ACTION FOR CDB-SMA-4 (SITES 54-017, 54-018, AND 54-020) AND PJ-SMA-17 (SITE 54-018) Document(s) Author: Rhodes, David S McInroy, Dave Veenis, Steve Number: ERID-260884 ; 2014
16. DOCUMENT: ANALYTICAL RESULTS FROM THE FIRST MEASURABLE STORM EVENT FOLLOWING INSTALLATION OF CONTROL MEASURES AT CDV-SMA-2.41 Document(s) Author: Rhodes, David S McInroy, Dave Veenis, Steve Number: ERID-260908 ; 2014