381. CANCELLATION OF EP-ERSS-SOP-5055, REVISION 0, STANDARD OPERATING PROCEDURE FOR GENERAL INSTRUCTIONS FOR FIELD INVESTIGATIONS Document(s) Author: NA Number: ERID-208109 ; 2011
382. STANDARD OPERATING PROCEDURE FOR EP-ERSS-SOP-5061, REVISION 1, FIELD DECONTAMINATION OF EQUIPMENT Document(s) Author: NA Number: ERID-207479 ; 2010
383. APPROVAL, EXTENSION REQUEST TO COMPLETE THE INSTALLATION OF PERCHED INTERMEDIATE WELL R-10I, LOS ALAMOS NATIONAL LABORATORY Document(s) Author: KIELING, JOHN E Number: ERID-208093 ; 2011
384. CANCELLATION OF EP-ERSS-SOP-5018, REVISION 0, STANDARD OPERATING PROCEDURE FOR INTEGRATED FIELDWORK PLANNING AND AUTHORIZATION Document(s) Author: NA Number: ERID-208110 ; 2011
385. REVIEW, INSPECTION AND MAINTENANCE OF EROSION CONTROLS IN DRAINAGES TO THE 90S LINE POND, LOS ALAMOS NATIONAL LABORATORY Document(s) Author: KIELING, JOHN E Number: ERID-208798 ; 2011
386. APPROVAL, ADDITIONAL EXTENSION REQUEST TO PLUG AND ABANDON TEST WELL 3, LOS ALAMOS NATIONAL LABORATORY Document(s) Author: KIELING, JOHN E Number: ERID-210133 ; 2012
387. STANDARD OPERATING PROCEDURE FOR EP-ERSS-SOP-5100, REVISION 1, METEOROLOGICAL TOWER HOIST OPERATION Document(s) Author: NA Number: ERID-210353 ; 2008
388. PERIODIC MONITORING REPORT FOR VAPOR-SAMPLING ACTIVITIES AT MATERIAL DISPOSAL AREA L FOURTH QUARTER FISCAL YEAR 2011, LOS ALAMOS NATIONAL LABORATORY (LANL) Document(s) Author: KIELING, JOHN E Number: ERID-209710 ; 2012
389. STANDARD OPERATING PROCEDURE EP-DIV-SOP-20006, REVISION 0, IPC-1, PRESSURE MONITORING OF PACKER SYSTEMS IN MONITORING WELLS Document(s) Author: NA Number: ERID-209342 ; 2012
390. APPROVAL, EXTENSION REQUEST TO PLUG AND ABANDON TEST WELL 3, LOS ALAMOS NATIONAL LABORATORY Document(s) Author: KIELING, JOHN E Number: ERID-210097 ; 2012