1. Approval with Modifications Technical Area 16 Well Network Evaluation and Recommendations Document(s) Author: Kieling, John Number: ERID-520747 ; 2012
2. Approval Modification to the March 1, 2005 Order on Consent to Change Periodic Groundwater Monitoring From Watershed-Specific to Area-Specific Monitoring Document(s) Author: Kieling, John Number: ERID-520171 ; 2012
3. CANCELLATION FOR EP-ERSS-SOP-5030, REVISION 0, CONTRACT GEOPHYSICAL LOGGING Document(s) Author: NA Number: ERID-210129 ; 2012
4. Approval with Modification Completion Report for Regional Aquifer Well R-64 Document(s) Author: Kieling, John Number: ERID-520076 ; 2012
5. Approval with Modifications Drilling Work Plan for Regional Aquifer Well R-47 Document(s) Author: Kieling, John E Number: ERID-521583 ; 2012
6. APPROVAL WITH MODIFICATION, WORK PLAN FOR A TRACER TEST AT CONSOLIDATED UNIT 16-021(C)-99, TECHNICAL AREA 16, LOS ALAMOS NATIONAL LABORATORY Document(s) Author: KIELING, JOHN E Number: ERID-210098 ; 2012
7. SOP: Physical Processing, Storage, and Examiination of Borehole Material at the Field Support Facility Document(s) Author: [Los Alamos National Laboratory] Number: ADEP-EP-DIR-SOP-20020 ; 2012
8. TEMPORARY PERMISSION TO DISCHARGE, TREATED WELL DEVELOPMENT AND PUMP TEST GROUND WATER DISCHARGE AT REGIONAL MONITORING WELL R-28, DP-1793 Document(s) Author: DAVIS, JAMES H Number: ERID-210297 ; 2012
9. SUMMARY OF NEW LOS ALAMOS NATIONAL LABORATORY GROUNDWATER DATA LOADED IN JUNE 2012 Document(s) Author: NA Number: ERID-221529 ; 2012
10. Review Class 1 Permit Modification Request Document(s) Author: Kieling, John Number: ERID-520650 ; 2012