81. APPENDIX B: SANDIA WETLAND PERFORMANCE REPORT, BASELINE CONDITIONS 2012-2014 Document(s) Author: MOUSSEAU, JEFF Number: ERID-257590-AppB ; 2014
82. HISTORICAL INVESTIGATION REPORT FOR MIDDLE CANADA DEL BUEY AGGREGATE AREA. 2) TARGET-CD LA-UR-07-7039 Document(s) Author: McInroy, Dave ; Stiger, Susan G ; Gregory, David R Number: ERID-098710 ; 2007
83. NOTICE OF APPROVAL, BASELINE GEOMORPHIC CONDITIONS REPORT, LOS ALAMOS AND PUEBLO CANYON WATERSHEDS, REVISION 1, LOS ALAMOS NATIONAL LABORATORY (LANL) Document(s) Author: BEARZI, JAMES P Number: ERID-201466 ; 2011
84. ERID-111748 NOTICE OF DISAPPROVAL, SUPPLEMENTAL INTERIM MEASURE REPORT SOLID WASTE MANAGEMENT UNIT 01-001(F), LOS ALAMOS NATIONAL LABORATORY Document(s) Author: JAMES P BEARZI Number: ERID-111748 ; 2011
85. FEE ASSESSMENT, PERIODIC MONITORING REPORT - RESULTS OF 2010 SEDIMENT MONITORING IN THE PAJARITO CANYON WATERSHED, LOS ALAMOS NATIONAL LABORATORY Document(s) Author: KIELING, JOHN E Number: ERID-201479 ; 2011
86. CONTROLLED DOCUMENT FOR EP-ERSS-SOP-5074 R.2 STANDARD OPERATING PROCEDURE FOR SAMPLING SUBSURFACE VAPOR Document(s) Author: NA Number: ERID-205473 ; 2010
87. CONTROLLED DOCUMENT FOR EP-ERSS-SOP-5039 R.0 STANDAD OPERATING PROCEDURE FOR PUMPING TESTS Document(s) Author: NA Number: ERID-205463 ; 2007
88. CONTROLLED DOCUMENT FOR SOP-5215 R.2.1 STANDARD OPERATING PROCEDURE FOR PROCESSING STORM WATER SAMPLES Document(s) Author: NA Number: ERID-205488 ; 2011
89. CONTROLLED DOCUMENT FOR EP-DIV-SOP-10005 R.0 STANDARD OPERATING PROCEDURE FOR OPERATING AND MAINTENANCE OF GAGE STATIONS FOR STORM WATER PROJECTS Document(s) Author: NA Number: ERID-205446 ; 2010
90. CONTROLLED DOCUMENT FOR EP-ERSS-SOP-5029 R.0 STANDARD OPERATING PROCEDURE FOR DRILLING PLAN DEVELOPMENT Document(s) Author: NA Number: ERID-205456 ; 2007