1. DEACTIVATION OF STANDARD OPERATING PROCEDURE SOP-09.05, REVISION 1, CLAY MINERAL AND ZEOLITE SEPARATION Document(s) Author: NA Number: ERID-207454 ; 2011
2. STANDARD OPERATING PROCEDURE EP-DIV-SOP-20014, REVISION 0, COLIWASA SAMPLER FOR LIQUIDS AND SLURRIES Document(s) Author: NA Number: ERID-207456 ; 2011
3. STANDARD OPERATING PROCEDURE EP-DIV-SOP-20015, REVISION 0, WEIGHTED BOTTLE SAMPLER FOR LIQUIDS AND SLURRIES IN TANKS Document(s) Author: NA Number: ERID-207457 ; 2011
4. DEACTIVATION OF STANDARD OPERATING PROCEDURE SOP-09.11, REVISION 0, PETROGRAPHY Document(s) Author: NA Number: ERID-207455 ; 2011
5. EP-DIV-SOP-10010,R0 PRESSURE TRANSDUCER INSTALLATION, REMOVAL, AND MAINTENANCE Document(s) Author: Douglass, Craig R Goering, Tim J Number: ERID-241174 ; 2011
6. STANDARD OPERATING PROCEDURE FOR EP-DIV-SOP-20005, REVISION 0, IPC-1, GROUNDWATER MONITORING WELL DUAL-SCREEN SAMPLING SYSTEM INSTALLATION AND TESTING Document(s) Author: Everett, Mark C ; Douglass, Craig R Number: ERID-208359 ; 2011
7. CANCELLATION OF ENV-WQH-QP-029, REVISION 2, CREATING AND MAINTAINING CHAIN OF CUSTODY Document(s) Author: NA Number: ERID-208832 ; 2011
8. CONTROLLED DOCUMENT FOR EP-DIV-SOP-20012, REVISION 0, IPC-2, INSTALLING, INSPECTING, AND MAINTAINING INDIVIDUAL PERMIT STORM WATER CONTROL MEASURES Document(s) Author: Banar, Alethea K ; Veenis, Steven J Number: ERID-208360 ; 2011
9. CANCELLATION OF EP-ERSS-SOP-5060, REVISION 0, OPERATIONAL GUIDELINES FOR TAKING SOIL AND WATER SAMPLES IN EXPLOSIVE AREAS Document(s) Author: WEBB, ED Number: ERID-208833 ; 2011
10. CANCELLATION OF ENV-WQH-SOP, REVISION 4.4, LARGE GENERATOR USE FOR PUMPING Document(s) Author: NA Number: ERID-209733 ; 2011