61. LANL 24-HOUR NOTICE FOR MTAL EXCEEDANCES IN VALIDATED DATA - 10-22-2013 Document(s) Author: NA Number: ERID-250965 ; 2013
62. NPDES PERMIT NO. NM0030759 - REQUEST FOR AN EXTENSION DUE TO FORCE MAJEURE UNDER PAR I.E.4(c) FOR SITES IN UPPER MORTANDAD CANYON Document(s) Author: MOUSSEAU, JEFF Number: ERID-250038 ; 2013
63. ENCLOSURE: ANALYTICAL RESULTS FROM THE FIRST MEASURABLE STORM EVENT FOLLOWING INSTALLATION OF CONTROL MEASURES AT A-SMA-2.7 Document(s) Author: NA Number: ERID-251213 ; 2013
64. ENCLOSURE: ANALYTICAL RESULTS FROM THE FIRST MEASURABLE STORM EVENT FOLLOWING INSTALLATION OF CONTROL MEASURES AT LA-SMA-1 Document(s) Author: NA Number: ERID-251216 ; 2013
65. NOTIFICATION OF FORCE MAJEURE AND ANTICIPATED NONCOMPLIANCE - LAPSE OF APPROPRIATIONS FOR ACTIVITIES UNDER THE LOS ALAMOS NATIONAL LABORATORY INDIVIDUAL STORM WATER NPDES PERMIT NO. NM0030759 Document(s) Author: MOUSSEAU, JEFF Number: ERID-250178 ; 2013
66. ENCLOSURE: ANALYTICAL RESULTS FROM THE FIRST MEASURABLE STORM EVENT FOLLOWING INSTALLATION OF CONTROL MEASURES AT S-SMA-2.01 Document(s) Author: Rhodes, David S McInroy, Dave Veenis, Steve Number: ERID-251220 ; 2013
67. ENCLOSURE: ANALYTICAL RESULTS FROM THE FIRST MEASURABLE STORM EVENT FOLLOWING INSTALLATION OF CONTROL MEASURES AT 2M-SMA-1.65 Document(s) Author: Rhodes, David S McInroy, Dave Veenis, Steve Number: ERID-251212 ; 2013
68. ENCLOSURE: ANALYTICAL RESULTS FROM THE FIRST MEASURABLE STORM EVENT FOLLOWING INSTALLATION OF CONTROL MEASURES AT M-SMA-1.22 Document(s) Author: NA Number: ERID-251219 ; 2013
69. NPDES PERMIT NO. NM0030759 - REQUEST FOR PERMIT MODIFICATION, SITE MONITORING REQUIREMENTS FOR SITE 72-001 (S-SMA-6) Document(s) Author: Rhodes, David S Maggiore, Peter Veenis, Steve MOUSSEAU, JEFF Number: ERID-250400 ; 2013
70. ENCLOSURE: ANALYTICAL RESULTS FROM THE FIRST MEASURABLE STORM EVENT FOLLOWING INSTALLATION OF CONTROL MEASURES AT S-SMA-4.1 Document(s) Author: Rhodes, David S McInroy, Dave Veenis, Steve Number: ERID-251221 ; 2013