61. REQUEST FOR EXTENSION TO COMPLETE INSTALLATION OF WELL R-63i Document(s) Author: Maggiore, Peter McCann, John P MOUSSEAU, JEFF Number: ERID-245174 ; 2013
62. 15 DAY NOTIFICATION FOR DRILLING ACTIVITIES FOR WELL CdV-R-63i Document(s) Author: McInroy, Dave Number: ERID-249301 ; 2013
63. COMPLETION OF CORRECTIVE ACTION AT SITE 00-018(b) IN P-SMA-0.3 Document(s) Author: NA Number: ERID-249474 ; 2013
64. SUBMITTAL OF THE WELL RECONFIGURATION OF CdV-16-4ip FIELD SUMMARY REPORT Document(s) Author: MOUSSEAU, JEFF Number: ERID-249518 ; 2013
65. NOTIFICATION OF CLASS 1 PERMIT MODIFICATION TO ATTACHMENT B, PART A APPLICATION FOR THE LOS ALAMOS NATIONAL LABORATORY HAZARDOUS WASTE FACILITY PERMIT, EPA ID # NM0890010515 Document(s) Author: Beausoleil, Geoffrey L Number: ERID-249070 ; 2013
66. APPENDIX B: PERIODIC MONITORING REPORT FOR MATERIAL DISPOSAL AREA AB MONITORING GROUP, MARCH 11 - MARCH 28, 2013 Document(s) Author: Maggiore, Peter Paris, Steven M MOUSSEAU, JEFF Number: ERID-249063-AppB ; 2013
67. STATUS REPORT, SANDIA/MORTANDAD WATERSHED JANUARY 1 - JUNE 30, 2013 Document(s) Author: Veenis, Steve Number: ERID-249686 ; 2013
68. ATTACHMENT: STATUS REPORT FOR PUMPING TEST AT WELL R-42 Document(s) Author: MOUSSEAU, JEFF Number: ERID-250069 ; 2013
69. ATTACHMENT: ANALYTICAL RESULTS FROM THE FIRST MEASURABLE STORM EVENT FOLLOWING INSTALLATION OF CONTROL MEASURES AT FIVE SITE MONITORING AREAS Document(s) Author: Rhodes, David M McInroy, Dave Veenis, Steve Number: ERID-249472 ; 2013
70. REQUEST FOR EXTENSION TO SUBMIT THE PHASE II INVESTIGATION WORK PLAN FOR POTRILLO/FENCE CANYON AGGREGATE AREA Document(s) Author: Maggiore, Peter McCann, John P MOUSSEAU, JEFF Number: ERID-249230 ; 2013