7.
Submittal of the Interim Measures Progress Report for Soil-Vapor Extraction of Volatile Organic Compounds from Material Disposal Area L; Technical Area 54
9.
Submittal of the Drilling Work Plan for Chromium Plume Control Interim Measure and Plume-Center Characterization Injection Wells CrIN-1 through CrIN-6