1. Compendium of Technical Reports Conducted Under the Work Plan for Chromium Plume Center Characterization Document(s) Author: Enrique Torres ; David Rhodes Number: ESHID-602964 ; 2018
2. Compendium of Technical Reports Related to the Deep Groundwater Investigation for the RDX Project at Los Alamos National Laboratory Document(s) Author: Enrique Torres ; David Rhodes Number: ESHID-602963 ; 2018
3. Annual Progress Report for Corrective Measures Implementation and Deep Groundwater Investigations for Consolidated Unit 16-021(c)-99 Document(s) Author: Bruce Robinson ; David Rhodes Number: ESHID-602746 ; 2017
4. Evaluation of Chromium Plume Control Interim Measure Operational Alternatives for Injection Well CrIN-6 Document(s) Author: Enrique Torres ; David Rhodes, Director Number: ESHID-603032-01 ; 2018
5. LETTER: TECHNICAL AREA 63 TRANSURANIC WASTE FACILITY SOIL VAPOR MONITORING WORK PLAN, LOS ALAMOS NATIONAL LABORATORY, EPA ID NO. NM0890010515 Document(s) Author: NA Number: ERID-255549 ; 2014
6. Submittal of Revision 1 to Investigation Work Plan for Material Disposal Area C (MDA C) Los Alamos National Laboratory (LANL) Environmental Protection Agency (EPA) ID#NM0890010515 Document(s) Author: David Gregory ; Dave McInroy Number: ESHID-603357 ; 2003
7. Multiple Activities Work Plan for the Treatment and Land Application of Groundwater from Mortandad and Sandia Canyons; DP-1793 Work Plan No. 5 Document(s) Author: John Bretzke ; Cheryl Rodriguez Number: ESHID-602241 ; 2017
8. Multiple Activities Work Plan for the Treatment and Land Application of Groundwater from Mortandad and Sandia Canyons DP-1793 WP No. 3 Document(s) Author: John McCann ; David Rhodes Number: ESHID-601362 ; 2016
9. Submittal of the Interim Measures Work Plan for Chromium Plume Control Document(s) Author: Alison Dorries ; Christine Gelles Number: ESHID-600458 ; 2015
10. Chromium Plume Control Interim Measure Performance Monitoring Work Plan Document(s) Author: Enrique Torres ; David Rhodes, Director Number: ESHID-603010 ; 2018