101. STANDARD OPERATING PROCEDURE - EP-DIV-SOP-20032, REVISION 0, GROUNDWATER SAMPLING Document(s) Author: Goering, Tim J ; Douglass, Craig R Number: ERID-207318 ; 2011
102. Appendix 1-5: Well Completion Report for Chromium Plume Control Interim Measure and Plume-Center Characterization Injection Wells CrIN-1; CrIN-2; CrIN-3; CrIN-4; and CrIN-5 Document(s) Author: Bruce Robinson ; David Rhodes Number: ESHID-602258-02 ; 2017
103. Investigation Report for Area of Concern 01-007(k) in the Upper Los Alamos Canyon Aggregate Area, Revision 1 Document(s) Author: Haagenstad, Todd Number: ESHID-600042-03 ; 2014
104. DOCUMENT: INVESTIGATION REPORT FOR AREA OF CONCERN 01-007(k) IN THE UPPER LOS ALAMOS CANYON AGGREGATE AREA Document(s) Author: Mirenda, Richard J Maggiore, Peter Haagenstad, Todd MOUSSEAU, JEFF Number: ERID-255108 ; 2014
105. ENCLOSURE: WELL RECONFIGURATION OF CdV-R-15-3 FIELD SUMMARY REPORT Document(s) Author: MOUSSEAU, JEFF Number: ERID-250071 ; 2013
106. NOTICE OF DISAPPROVAL, UPPER CANADA DEL BUEY AGGREGATE AREA INVESTIGATION REPORT, LOS ALAMOS NATIONAL LABORATORY Document(s) Author: BEARZI, JAMES P Number: ERID-201475 ; 2011
107. Completion Report for Groundwater Extraction Well CrEX-1 Document(s) Author: Brandt,Michael ; Maggiore, Peter Number: ESHID-600170-02 ; 2015
108. Solid Waste Management Unit Assessment Report Work Plan for the Los Alamos Canyon Borrow Pit; Revision 1 Document(s) Author: Bruce Robinson ; David Rhodes Number: ESHID-602010-01 ; 2016
110. Chromium Background Study Work Plan Document(s) Author: Bruce Robinson ; David Rhodes Number: ESHID-602400 ; 2017